Land Use & Development Near the Lake
Community, Policy & Reporting
How siting, design, and construction choices on lakefront and nearby parcels affect water clarity, habitat, and community life—and how residents can participate constructively.
Big Principles (Plain Language)
- Distance is protection: Bigger setbacks and vegetated buffers reduce erosion and nutrient loads
- Less hard surface = cleaner water: Limit impervious cover (roofs, driveways, patios); use infiltration where feasible
- Keep natural edges: Preserve wetlands, trees, and coarse woody habitat; design around them
- Build light on the land: Phase work, stabilize daily, and work during low-risk seasons
Site Planning Basics
- Map constraints first: Ordinary High Water Line (OHWL), wetlands, floodplains, steep slopes, shallow soils/bedrock, septic areas
- Place structures uphill: Site homes and outbuildings outside shoreline setbacks; step foundations up the slope rather than cutting benches
- Cluster hard surfaces: Keep driveways short and narrow; share access where possible
- Buffer the shore: Aim for a 10–35+ ft native strip from water's edge; keep view windows narrow
Setbacks & Buffers (What They Do)
- Shoreline setback:
- Minimum horizontal distance from OHWL to buildings/hardscape
- Vegetative buffer:
- Planted/maintained native zone that filters runoff and stabilizes banks
- No-disturb zones:
- Areas where grading, clearing, or fill are limited to protect sensitive resources
Low-Impact Development (LID) Features
- Infiltration practices: Rain gardens, vegetated swales, infiltration trenches
- Permeable surfaces: Pavers, porous asphalt, or reinforced turf for drives/paths
- Level spreaders & disconnects: Break up concentrated flows from downspouts and driveways
- Green roofs / rainwater reuse: Where appropriate, reduce and delay runoff
Driveways, Patios & Paths (Design Choices)
- Right-size width and length; avoid double-wide drives unless necessary
- Crown or cross-slope to shed water into vegetation, not ditches
- Use permeable surfaces or wheel strips; keep edge drains discharging to lawn/plantings
Grading & Construction (Do This, Not That)
Do:
- Phase clearing; keep native groundcover until just before work
- Install silt fence/wattles on contour before excavation; maintain after storms
- Stabilize daily—seed/mulch or blanket bare soil at day's end
Don't:
- Stockpile soil at the bank; keep piles covered and set back with a berm
- Create straight ditches; use shallow, vegetated swales
Trees & Vegetation
- Preserve mature trees; they intercept rain, shade shorelines, and anchor slopes
- Protect roots: Fence off dripline during construction; keep grade changes minimal around trunks
- Re-vegetate promptly with native plants matched to sun and moisture zones
Septic & Wells
- Respect setbacks between wells, septic tanks/fields, and waterbodies
- Site septic upslope where feasible; route roof water away from the field
- Abandon unused wells with licensed pros; keep records
Subdivisions & Shared Shores (Community Scale)
- Conservation design: Cluster lots away from shore to leave shared open space/buffers
- Shared access: One durable launch or dock area reduces cumulative impact
- Stormwater on-site: Design for first-inch capture with distributed LID; size culverts to natural channels
Lighting, Sound & Views
- Fully shielded, warm-tone lighting on timers/motion sensors; keep fixtures low and aimed down
- Quiet hours agreements for construction and operation; plan generator/enclosure locations
- View windows through buffers rather than wholesale clearing
Permits & Reviews (What to Expect)
- Shoreland zoning: Controls on setbacks, height, impervious limits, vegetation removal
- Grading/fill permits: Required for earthwork near water/wetlands
- Wetland/Waterbody approvals: Work below OHWL or in wetlands often needs state/federal review
- Stormwater plans: Larger projects may require erosion control and post-construction BMP plans
Public Participation (Constructive & Effective)
- Read the proposal: Site plan, grading, drainage, tree removal, shoreline treatment, and lighting
- Focus comments on facts: slopes, soils, buffers, runoff paths, traffic/parking, and how LID could reduce impacts
- Be specific & practical: Suggest measurable fixes (e.g., add a 25-ft buffer, switch to permeable pavers, move driveway 20 ft upslope)
- Mind timelines: Submit comments before hearings; attend with brief points and alternatives
Quick Checklists
For Applicants
- Structures outside shoreline setbacks
- Impervious area minimized and clustered
- Buffer width ≥ target; native planting plan attached
- LID practices sized/located with overflow paths
- Erosion controls installed/maintained during work
- Tree protection and restoration plan
For Neighbors/Reviewers
- Sensitive areas mapped (wetlands, steep slopes)
- Runoff routes identified and treated
- Driveway/path design minimizes length/width; permeable where feasible
- Lighting shielded and low-glare; quiet hours noted
- Post-construction maintenance spelled out
Bottom Line
Thoughtful siting, small footprints, and living edges protect water quality while meeting project goals. Participate early with fact-based, practical suggestions to improve designs and outcomes.
Related Topics
Key Takeaways
- Distance is protection—bigger setbacks help
- Minimize impervious surfaces
- Preserve natural edges and mature trees
- Use LID features for stormwater
- Phase work and stabilize daily
- Participate constructively with facts
Big Principles
- Distance: Bigger setbacks & buffers
- Less hard surface: Limit impervious cover
- Natural edges: Preserve wetlands & trees
- Light touch: Phase work, stabilize daily
LID Features
- Rain gardens & swales
- Permeable surfaces
- Level spreaders
- Green roofs & rain barrels
Participation Tips
- Read the full proposal
- Focus on facts, not opinions
- Suggest measurable fixes
- Submit comments on time
Need Development Guidance?
Contact your local planning department, conservation district, or lake association for guidance on development standards and best practices.
Get Help